The project began on 19 September 2026. Design records are append-only: each revision is written above the previous one and says what it replaces.
01
Timeline
02
Entries
| Date | What happened |
|---|---|
| 19–20 Sep | The interview harness: subscription model clients, frozen configurations, and an evaluator account that alone can open the held-out answers. |
| 22–23 Sep | An extraction assay, an elicitation design and a null model. Remote sessions that run without any model. |
| 24 Sep | The goal moves: from predicting a person's answers to a replica that carries on as them. |
| 25–26 Sep | The General Social Survey pilot: three nights of local inference, 36,810 forecasts. |
| 27–29 Sep | Personal-updating studies and a reading programme on consciousness and connectomics, then a pause to consolidate. |
| 4 Oct | The drift battery is scored, and architecture v0 is written down. |
| 5 Oct | The base specification and the research on change and voice. M1 is designed. |
| 6–7 Oct | The first engine trains on 400M tokens, then fails its first real test. The corpus is rebuilt so that reading is necessary. |
| 9–11 Oct | Revisions 1.3.1 to 1.3.9 of the acceptance gate, each reviewed independently. Pretraining moves to rented GPUs. |
03
M1 revisions
| Revision | Date | What changed |
|---|---|---|
| 1.0–1.1 | 5 Oct | The original design and the decisions after the first build review. |
| 1.2–1.2.8 | 6–7 Oct | Argument and voice families, engine decisions, smoke drivers; 1.2.8 diagnoses the failed first test. |
| 1.3 | 7 Oct | A corpus in which reading is necessary. |
| 1.3.1–1.3.2 | 9 Oct | Person conditioning, and the gate on the full recipe. |
| 1.3.3–1.3.5 | 10 Oct | Decisions after the build reviews; the implementation's open failures. |
| 1.3.6–1.3.9 | 10–11 Oct | Fixes for every way the reviewers found a check could pass without its capability. |